Shed Soil Stabilization
Location: Garden Valley Idaho Issue: The property is located in a mountainous area. An area was cleared for a 16W x 32L shed. Large cement barrier blocks were brought in by the excavator before back filling the building site. The excavation contractor used native soil from the property for back fill material; the native soil…